What a primary suite remodel covers.
Walls and layout
Moving or opening walls, with the engineering and permits the change needs.
The primary bath
A double vanity, a larger shower, and everything on the bathroom page.
Bedroom and closet
A walk-in or built-in closet, lighting, and finishes.
Design and selections
Drawings from your designer, or from a designer we bring in, and selections made before the price is set.
Six steps, in this order.
- STEP 1
Site walk
We walk the room with you and talk through what you want and what the house allows.
- STEP 2
Written scope
We write the scope of work, room by room, and you confirm it before anything is priced.
- STEP 3
A price range
A rough order of magnitude, or ROM, built line by line from the confirmed scope.
- STEP 4
Preconstruction
Selections, drawings where the work needs them, subcontractor bids, and the firm price. The preconstruction fee is credited in full to the construction contract.
- STEP 5
Build
A set schedule, a clean site at the end of each day, and any change priced and signed before the work happens.
- STEP 6
Walkthrough
A final walkthrough, every punch item closed, and a one-year workmanship warranty.