What a powder room remodel covers.
Vanity, mirror, and lighting
A vanity or wall-hung sink, a mirror, and lighting on its own switch.
Toilet and fixtures
A new toilet, faucet, and accessories, with new supply lines and shutoffs.
Tile and walls
Floor tile, a tiled or paneled wall, and paint.
Door and trim
A new door, casing, and baseboard to match the rest of the house.
Six steps, in this order.
- STEP 1
Site walk
We walk the room with you and talk through what you want and what the house allows.
- STEP 2
Written scope
We write the scope of work, room by room, and you confirm it before anything is priced.
- STEP 3
A price range
A rough order of magnitude, or ROM, built line by line from the confirmed scope.
- STEP 4
Preconstruction
Selections, drawings where the work needs them, subcontractor bids, and the firm price. The preconstruction fee is credited in full to the construction contract.
- STEP 5
Build
A set schedule, a clean site at the end of each day, and any change priced and signed before the work happens.
- STEP 6
Walkthrough
A final walkthrough, every punch item closed, and a one-year workmanship warranty.