Most people start a construction project with the same two questions: what will it cost, and can we afford it? The honest answer, before any design work exists, is a range, and that range has a name. A ROM, or rough order of magnitude, is an early planning number based on your project’s scope and the cost of comparable work. At Aether Builds, a ROM is complimentary.
What a ROM is for
A ROM exists to help you make one decision: whether this project, at roughly this scale, fits your budget, before you spend money on design and detailed planning. It tells you whether a kitchen remodel and an addition belong in the same conversation, whether the scope should grow or shrink, and whether now is the right time to proceed.
It’s also a conversation starter. Walking a site and putting an early number to an idea surfaces the questions that shape the project: what matters most to you, where the budget should concentrate, and what could be phased for later.
What a ROM is not
A ROM is not a bid, and it is not a promise. It is a range built on assumptions that haven’t been tested yet, with no finished drawings, no engineering, no subcontractor pricing, and no selections. Treating an early range as a fixed price is how projects end up feeling over budget when nothing actually went wrong.
A ROM answers “is this project realistic?” It does not answer “what will my invoice say?”
How the number firms up
When a ROM looks workable, the next step is preconstruction, a paid agreement where the real work of pricing happens: drawings are completed, scope is defined line by line, selections are made, and subcontractor bids come in against a defined scope. At the end of preconstruction you receive an estimate: firm pricing, because by then it’s built on real bids rather than assumptions.
What makes an early number move
Three things, mostly. Scope changes, as the project grows or shifts while design develops. Selections, where the gap between a standard fixture and a bespoke one is real money. Site unknowns, since what’s behind the wall or under the slab can’t be priced until it’s known. Preconstruction exists to resolve all three before construction starts, so the price you sign is the price you planned around.
Start with the range