Ask anyone who’s had a renovation go sideways and the story usually starts the same way: something changed mid-project, nobody wrote it down, and the disagreement showed up later as an invoice. The fix is a piece of paperwork with an unglamorous name, the change order, and it’s one of the most client-protective documents in construction.
What a change order is
A change order is a written record of any change to a project’s scope, price, or schedule after the contract is signed. At Aether Builds, every change gets one, and it gets approved before the changed work proceeds. Not after. Not verbally. Before.
What triggers one
Three things, in practice. You ask for something new, such as a different tile, an extra outlet, or a bigger window. A concealed condition turns up, such as dry rot behind siding, wiring that isn’t to code, or the surprises no one can see until the wall is open. Or a selection changes in a way that affects cost or lead time. Big or small, the process is the same.
What ours include
A plain description of the change, its effect on price, its effect on schedule, and a signature line. That’s it. The point is not bureaucracy. It’s that both of us agree on the same facts at the moment the decision is made, while the options are still open.
A change order is agreement in writing, made while you still have a choice.
Why this protects you
Because a project’s price should never be a matter of memory. With every change documented, there are no surprise invoices at the end, no “but we discussed this on site,” and no pressure to accept a cost you never approved. It also protects the schedule: writing a change down forces the schedule conversation to happen up front, not after the delay.
It protects the relationship, too. Most construction disputes aren’t about bad work. They’re about mismatched expectations. A written record on every change means the expectations never get the chance to drift.
What to ask any builder
If you’re interviewing contractors, ask one question: “How do you handle changes mid-project?” The answer tells you a lot. Ours is simple. Every change is in writing, priced, and approved by you before the work proceeds.
